Edit thread icon
Delete thread icon
Upload
Remove
ops

DGAA: Maximum parking - 3 days. 12 FEB-12 MAR18. Impact: Slight.

Comments iconVotes icon0
Votes iconVotes icon0
Views iconVotes icon3
Vote button Vote button
Vote button Vote button
NOTAM A0500/17 parsed by Aviapages NOTAM decoder: Valid from: 12 Dec 2017 2359 LT (12 Dec 2017 2359 UTC) Valid till: 12 Mar 2018 2359 LT (12 Mar 2018 2359 UTC) (Estimated, Valid until cancelled or replaced) NOTAM message DUE TO MAJOR WORK IN PROGRESS AT KIA AIRPORT STANDS NOW AVAILABLE ONLY TO AIRCRAFT DOING A QUICK TURN AROUND FLIGHT. LONGITUDE LAY OVER AIRCRAFTS ARE PERMITTED FOR ONLY THREE DAYS PARKING. PILOTS INTENDING TO DO EXCESS OF THREE DAYS LONGITUDE LAY OVER MUST SEEK APPROVAL FROM THE DIRECTOR OF AIRPORT OPERATIONS, GACL. Area of influence: 5.36N 0.1W, R 9 km (5 NM) More details: This NOTAM (ID A0500) issued in 2017 is a new one Purpose: PIB entry, Operationally significant for IFR flights Scope: Aerodrome Significant for IFR and VFR traffic Original Notam A0500/17 NOTAMN Q) DGAC/QMPLT/IV/BO /A /000/999/0536N00010W005 A) DGAA B) 1712122359 C) 1803122359 EST E) DUE TO MAJOR WIP AT KIA AIRPORT STANDS NOW AVAILABLE ONLY TO AIRCRAFT DOING A QUICK TURN AROUND FLIGHT. LONG LAY OVER AIRCRAFTS ARE PERMITTED FOR ONLY THREE DAYS PARKING. PILOTS INTENDING TO DO EXCESS OF THREE DAYS LONG LAY OVER MUST SEEK APPROVAL FROM THE DIRECTOR OF AIRPORT OPERATIONS, GACL.

Notifications